Ningxia Zhongwei 3 GW Solar Farm

2025-07-09 Zhongwei, Ningxia 3 GW Utility-Scale
Ningxia Zhongwei 3 GW Solar Farm

On the south-eastern edge of the Tengger desert, 3 GW of single-axis tracking capacity now feeds the regional grid from land that was previously bare gravel. BDKLEAD supplied the module strings, trackers, string inverters and the MV collection equipment, and stayed on site from first pile to grid connection.

The site is one of the highest-irradiance regions in China, which also means the harshest working conditions: airborne sand, 40 °C summer peaks and a 35 °C swing between day and night. Everything specified for the project had to hold its rated performance across that range for 25 years.

The Challenge

Winter sandstorms bury module rows and load tracker drives far beyond the datasheet envelope, while summer dust cuts irradiance on the lower rows. The client needed a design that could be cleaned and serviced without losing generation time, and a delivery schedule that fit a single 14-month construction window.

What We Delivered

  • 5.4 million bifacial modules mounted on 1,480 tracker rows, arranged in 32 blocks with dedicated service roads.

  • String inverters and MV skids rated for 50 °C ambient, derated for altitude and fitted with sand-filter intakes.

  • One 330 kV booster station plus 212 km of MV cabling, commissioned block by block so generation started before the site was complete.

  • An O&M package including water-free cleaning robots, spare tracker drives and a two-year site support agreement.

3 GW

Installed Capacity

5.4 M

Bifacial Modules

4.8 TWh

First-Year Yield

14 mo

Build Programme

The Result

The plant reached full load two weeks ahead of the contractual date. First-year generation landed at 4.8 TWh, roughly 4 % above the pre-build model, and the sand-tolerant intakes kept inverter availability above 99 % through the first spring storm season.

Get Free Quote

Energy storage engineered to your project — talk to our team today